AA Design + Make Masters study at the Architectural Association Hooke Park

Testing connection details

We are testing our first run of the whole production sequence to build a 2/3rd scale mockup of a section of the truss this week. Connection details are being worked on – using the 3D scan mesh data. Also, fabrication of a lifting gantry and robot cell trolley began – as part of the robot fabrication strategy.