AA Design + Make Masters study at the Architectural Association Hooke Park

September 8, 2013 – TSS: Resuming Production

After a much needed summer holiday break, the team and a new cohort of Summer Build volunteers have resumed the steaming, bending, assembly and construction sequence of the Timber Seasoning Shelter.