AA Design + Make Masters study at the Architectural Association Hooke Park

Curved formwork – preparation

It turns out that formwork is much more complicated than the resulting wall. The boiler house has a concrete slab foundation system and the curvy log walls sit upon curvy concrete base walls. We decided to create frames which could create the inner and outer walls and then clad them in plywood which can bend to the shape of the curves.